Drilling and Tapping

Posted on

We are at that point were we are having to look at making up the ballast keel (box).

The box is going to be made of 22mm mild steel with stringers that are out of 60mm plate which is to be drilled and tapped with 22mm holes. when the box is made up we will fill the voids with cement and lead.

The box will be held to the boat with 18 mild steel studs wrapped in ptfe tape and lithium based water pump grease

Total ballast weight will be 5000 kilos

We are in the middle of preparing the hull of the boat to put the covering of bi ax cloth and epoxy resin keep looking in for our up dates on this.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.